Here are some of the realizations of Solution Optimum:

Waste management sector
Year Structure Location Surface area (sq. m.)
2009 Treatment pond Bury, phase 2 20 000
2009 Waste storage containment cell Bury, phase 1 35 000
2009 Leachate treatment pond Champlain 10 000
2008 Landfill capping Cowansville 70 00
2008 Waste storage containment cell Chicoutimi 18 000
2007 Waste storage containment cells St-Étienne-des-Grès 100 000
2006 Waste storage containment cell St-Nicéphore 60 000
2006 Landfill capping St-Étienne-des-Grès 40 000
2005 Waste storage containment cell Ste-Sophie 30 000
2005 Waste storage containment cell St-Étienne-des-Grès 40 000
2005 Landfill capping Cantley 35 000
Industrial and institutional sectors
Year Structure Location Surface area (sq. m.)
2008 Secondary containment Puvirnituq 3 000
2008 Secondary containment Deception Bay 3 000
2007 Leak detection system Quebec City 5 000
2007 Secondary containment Quebec City 10 000
2006 Temporary storage cell Charny 6 000
2006 Secondary containment Tasijuaq 5 000
Civil engineering sector
Year Structure Location Surface area (sq. m.)
2008 Decantation pond, highway 55 Trois-Rivières 3 000
2008 Impermeabilization of ditches, Highway 55 Ste-Eulalie 50 000
2007 Bridge approaches, highway 50 Brownsburg 20 000
2006 Wastewater treatment ponds Kuujjuarapik 20 000